Pemanfaatan Limbah Sampah Sebagai Energi Alternatif Pembangkit Tenaga Listrik di Semarang
Abstract
The need for electrical energy in Indonesia is increasing every year so other alternative energy sources need to be found. Waste is a major problem for residents of many cities, along with the rate of population growth which has an impact on the increasing amount of waste generated. To explore the potential of new renewable energy, namely the construction of a Waste Power Plant (PLTSa). Potential of waste energy in Jatibarang Landfill sourced from 16 sub-districts of Semarang City Region has a large amount of waste production, so that in this study research needs to be done on the use of waste as an alternative energy source to be utilized as Renewable Energy (EBT) to be managed into electrical energy that is useful for the community. From this study the electrical energy that can be utilized for PLTSa in 1 year for the next 5 years (2017 - 2021) is 84,627.02 Mwh / year in 2017, then 82,308.43 Mwh / year in 2018, after that 83,627.97 Mwh / year in 2019, then 83,179.35 Mwh / year in 2020, and finally 83,434.88 in 2021. The average output power of generators is 9,525.63 kW as potential electrical energy from waste waste.
References
D. L. H. K. Semarang, “Pengolahan TPA Jatibarang,” Pengolah. TPA Jaitbarang di Kota Semarang, 2017.
N. K. S. Faridha, Budi Pirngadie, “POTENSI PEMANFAATAN SAMPAH MENJADI LISTRIK DI TPA CILOWONG KOTA SERANG PROVINSI BANTEN,” Ketenagalistrikan dan Energi Terbarukan, vol. 14, pp. 103–116, 2015.
P. Monice, “SainETIn (Jurnal Sain, Energi, Teknologi & Industri),” SainETIn (Jurnal Sain, Energi, Teknol. Ind., vol. 1, pp. 9–16, 2016.
S. Monice, “OPERASI EKONOMIS (economic Dispatch) Pembangkit Listrik Tenaga Sampah (PLTSa) dan (PLTG) dalam Melayani Beban Puncak Kelistrikan Sumbar,” Operasi Ekon., vol. 2, 2013.
E. dan T. P. Damanhuri, PENGELOLAAN SAMPAH, Semester1. Bandung, 2010.
3 Sandra, Santosa Soemarno1, “Peningkatan Nilai Kalor Produk pada Produk Proses Bio-drying Sampah Organik Improved Calor Value on Biodrying Production of Organic Waste,” Indones. Green Technol. J.
Dian Marya Novita1 dan Enri Damanhuri2, “PERHITUNGAN NILAI KALOR BERDASARKAN KOMPOSISI DAN KARAKTERISTIK SAMPAH PERKOTAAN DI INDONESIA DALAM KONSEP WASTE TO ENERGY,” J. Tek. Lingkung., vol. 16, p. 2, 2010.
Enri Damanhuri – Tri Padmi, “Program Studi Teknik Lingkungan FTSL ITB,” Diktat KuliahPengelolaan Sampah, vol. 8, pp. 8–14, 2015.
Safrizal, “DISTRIBUTED GENERATION PEMBANGKIT LISTRIK TENAGA SAMPAH KOTA (PLTSa) TYPE INCINERATOR SOLUSILISTRIK ALTERNATIF KOTA MEDAN,” Pros iding SNATIF, vol. 1, p. 124, 2014.
Asmudi, “ANALISA UNJUK KERJA BOILER TERHADAP PENURUNAN DAYA PADA PLTU PT. INDONESIA POWER UBP PERAK,” Tek. Sist. Perkapalan Fak. Teknol. Kelautan, ITS Surabaya.
I. P. Pintar, Modul Pelatihan PENGENALAN GENERATOR, EXCITER DAN AUTO VOLTAGE REGULATOR (AVR).
DAVID MABRUR PRANOTO, “ANALISIS GENERATOR PADA PEMBANGKIT LISTRIK,” Lap. Kerja Prakt. unikom, p. 24, 2008.
Y. P. Arman Hakim, PERENCAMAAM DAN PENGENDALIAN PRODUKSI, 1st ed. Yogyakarta: Graha Ilmu, 2008.
B. P. S. K. Semarang, Kota semarang 2016, ANGKA SEMARANG. Semarang: BPS KOTA SEMARANG/ BPAS STATISTICS OF SEMARANG MUNICIPALITY, 2016.
M. M. Dyah Ernawati, Sri Budiastuti, “ANALISIS KOMPOSISI, JUMLAH DAN PENGEMBANGAN STRATEGI PENGELOLAAN SAMPAH DI WILAYAH PEMERINTAH KOTA SEMARANG BERBASIS ANALISIS SWOT,” EKOSains, vol. IV, p. 2, 2012.
laporan Tugas Akhir Elisabeth Apriani Sihotang, “RANCANGAN ALAT INCINERATOR UNTUK PEMBAKARAN LIMBAH KAYU DENGAN KAPASITAS 60 KG/ 2 JAM,” 2016.
URAY IBNU FARUQ, “STUDI POTENSI LIMBAH KOTA SEBAGAI PEMBANGKIT LISTRIK TENAGA SAMPAH (PLTSa) KOTA SINGKAWANG,” Progr. Stud. Tek. Elektro Jur. Tek. Elektro Fak. Tek. Univ. Tanjungpura Pontianak, 2016.